|
CUSTOMER CASE |
One¡¢Newly installed debugging and running some cases
 |
1£¬China Huaneng Group (referred to as the Huaneng Group) Baotou Thermal Power Plant ¡¡¡¡May 21 2012 Ke Li Sen assist Baotou Thermal Power Plant successful installation and commissioning of 9 KLS-380W water cold air compressor power 280KW displacement of 50.1 cubic meters / officially up and running. Has the normal operation of the machine as a whole, in good condition. |
 |
2£¬Guangxi Liuzhou Chemical Industry Co., Ltd. ¡¡¡¡November 25, 2012 Ke Li Sen assist Guangxi Liuzhou Chemical successful installation and commissioning 450KW displacement of 83.2 cubic meters / 5 KLS-600W water cold air compressor power station officially up and running. Has the normal operation of the machine as a whole, in good condition. |
 |
3£¬Jiangxi South Tunnel Engineering Co., Ltd. ¡¡¡¡December 10, 2012, Ke Li Sen assist Tunnel Engineering Co., Ltd. of Jiangxi South successful installation and commissioning of the 16-KLS-150G wind cold air compressor power 110KW displacement of 20.6 cubic meters / officially up and running. Since normal operation of the machine as a whole, in good condition |
Two¡¢Long-term cooperation customers

|
|
|